CCI-002958
CCI-002958 Definition
Status | |
Type | CheckType.policy |
Master Assessment Datasheet
Implementation Guidance
The organization being inspected/assessed implements a long-term alternate power supply for the information system that is capable of maintaining minimally required operational capability or full operational capability in the event of an extended loss of the primary power source.
Validation Procedures
The organization conducting the inspection/assessment obtains and examines documentation identifying the implemented alternate power supply to ensure the organization being inspected/assessed implements a long-term alternate power supply for the information system that is capable of maintaining minimally required operational capability or full operational capability in the event of an extended loss of the primary power source.
Compelling Evidence
1.) Documentation of long-term alternate power supply for the information system that is capable of maintaining minimally required operational capability in the event of an extended loss of the primary power source