Check: RHEL-09-653025
RHEL 9 STIG:
RHEL-09-653025
(in versions v1 r3 through v1 r1)
Title
RHEL 9 audit system must take appropriate action when the audit storage volume is full. (Cat II impact)
Discussion
It is critical that when the operating system is at risk of failing to process audit logs as required, it takes action to mitigate the failure. Audit processing failures include software/hardware errors; failures in the audit capturing mechanisms; and audit storage capacity being reached or exceeded. Responses to audit failure depend upon the nature of the failure mode.
Check Content
Verify RHEL 9 takes the appropriate action when the audit storage volume is full. Check that RHEL 9 takes the appropriate action when the audit storage volume is full with the following command: $ sudo grep disk_full_action /etc/audit/auditd.conf disk_full_action = HALT If the value of the "disk_full_action" option is not "SYSLOG", "SINGLE", or "HALT", or the line is commented out, ask the system administrator (SA) to indicate how the system takes appropriate action when an audit storage volume is full. If there is no evidence of appropriate action, this is a finding.
Fix Text
Configure RHEL 9 to shut down by default upon audit failure (unless availability is an overriding concern). Add or update the following line (depending on configuration "disk_full_action" can be set to "SYSLOG" or "SINGLE" depending on configuration) in "/etc/audit/auditd.conf" file: disk_full_action = HALT If availability has been determined to be more important, and this decision is documented with the information system security officer (ISSO), configure the operating system to notify SA staff and ISSO staff in the event of an audit processing failure by setting the "disk_full_action" to "SYSLOG".
Additional Identifiers
Rule ID: SV-258154r926449_rule
Vulnerability ID: V-258154
Group Title: SRG-OS-000047-GPOS-00023
Expert Comments
CCIs
Number | Definition |
---|---|
CCI-000140 |
The information system takes organization-defined actions upon audit failure (e.g., shut down information system, overwrite oldest audit records, stop generating audit records). |
Controls
Number | Title |
---|---|
AU-5 |
Response To Audit Processing Failures |